Balintawak station

Balintawak
General information
Location1179 EDSA, Balintawak
Quezon City, Metro Manila,
Philippines
Owned byDepartment of TransportationLight Rail Transit Authority
Operated byLight Rail Manila Corporation
Line(s)     Line 1
Platforms2 (2 side)
Tracks2
Connections E  Balintawak
Construction
Structure typeOverpass
ParkingYes (Puregold Monumento, Ayala Malls Cloverleaf, Juliana Wet & Dry Market)
AccessibleYes
Other information
Station codeBW
History
OpenedMarch 22, 2010; 13 years ago (2010-03-22)[1]
Services
Preceding station LRTA_Logo
Manila LRT
Following station
Fernando Poe Jr.
Terminus
Line 1 Monumento
towards Baclaran
Location
Balintawak is located in Manila
Balintawak
Balintawak
Location within Metro Manila

Balintawak station is an elevated Manila Light Rail Transit (LRT) station situated on Line 1, and was constructed as part of the Line 1 North Extension Project. It opened on March 22, 2010.[1] The station serves passengers going to and from the northern parts of Luzon using the North Luzon Expressway.

Balintawak is one of two Line 1 stations serving Quezon City, the other being Fernando Poe Jr. It is the second station for trains headed to Baclaran and the nineteenth station for trains headed to Fernando Poe Jr. It served as the temporary northern terminus of the line before the completion of Fernando Poe Jr. station in October 2010 and during the temporary closure of that station since September 2020 until December 2022 due to the ongoing construction of the North Triangle Common Station.[2]

The station is located at the boundary of barangays Balingasa, Unang Sigaw, and Apolonio Samson, in front of the Balintawak Market and near the Quezon CityCaloocan boundary. It is located near the Balintawak Cloverleaf.

History

Balintawak station was constructed as part of the Line 1 North Extension Project, a 5.4-kilometer (3.4 mi) extension of LRT-1 to the North Avenue station of MRT Line 3 as part of the MRT-LRT closing the loop project to integrate the operations of the LRT-1 and MRT-3. However, the integration of MRT-3 and LRT-1 operations did not happen, but this will change when the North Triangle Common Station is set to partially open in 2022. Construction of the North Extension started in July 2008 and was completed in 2010. Balintawak station was opened on March 22, 2010.[1]

Transportation links

There are several city buses and jeepneys plying EDSA, as well as A. Bonifacio Avenue below the Balintawak Interchange. A UV Express terminal is also found at Ayala Malls Cloverleaf. The station serves as an interchange with the EDSA Carousel. The EDSA Carousel is accessible via the emergency exits of the station.

Nearby landmarks

View of Balintawak station from street level

The station is close to Balintawak Market and adjacent to Puregold Balintawak. An access road to Ayala Land's Cloverleaf estate is built right beside the station. Accessing Ayala Malls Cloverleaf from the station requires riding the shuttle service stationed near the southbound entrance.[citation needed]

See also

References

  1. ^ a b c "LRT opens Balintawak station". ABS-CBN News. March 22, 2010. Retrieved March 11, 2021.
  2. ^ Ong, Ghio (August 8, 2020). "LRT-1 to close Roosevelt station". The Philippine Star. Retrieved March 11, 2021.

14°39′26.44″N 121°0′14.26″E / 14.6573444°N 121.0039611°E / 14.6573444; 121.0039611