Changchun Qiao station
![]() Line 12 platform | ||||||||||||||||
General information | ||||||||||||||||
Location | Changchun Bridge (长春桥) Landianchang North Road (蓝靛厂北路) / Landianchang South Road (蓝靛厂南路) and Yuanda Road (远大路) / Changchunqiao Road (长春桥路) Haidian District, Beijing China | |||||||||||||||
Coordinates | 39°57′31″N 116°17′39″E / 39.958527°N 116.294255°E | |||||||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | |||||||||||||||
Line(s) | Line 10 Line 12 | |||||||||||||||
Platforms | 4 (2 island platforms) | |||||||||||||||
Tracks | 4 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
Accessible | Yes | |||||||||||||||
History | ||||||||||||||||
Opened | December 30, 2012 December 15, 2024 (Line 12) | (Line 10)|||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
|
Changchun Qiao station[1] (simplified Chinese: 长春桥站; traditional Chinese: 長春橋站; pinyin: Chángchūn Qiáo zhàn) is an interchange station between Line 10 and Line 12 of the Beijing Subway.[2] The Line 10 station opened on December 30, 2012.[3] The Line 12 station opened on December 15, 2024.
Station layout
The station has underground island platforms for both Line 10 and Line 12.
Location and Name
![](http://upload.wikimedia.org/wikipedia/commons/thumb/c/c9/Notice_about_the_connection_to_GR_Shopping_Mall_at_Changchun_Qiao_Station_%28Dec_2024%29_%281%29.jpg/220px-Notice_about_the_connection_to_GR_Shopping_Mall_at_Changchun_Qiao_Station_%28Dec_2024%29_%281%29.jpg)
It is located a short distance from the Golden Resources Mall, one of the world's largest shopping malls. The station also serves the Yuanda residential area.
![](http://upload.wikimedia.org/wikipedia/commons/thumb/5/5d/Changchun_Bridge_near_Changchun_Qiao_Subway_Station_%28Dec_2024%29.jpg/220px-Changchun_Bridge_near_Changchun_Qiao_Subway_Station_%28Dec_2024%29.jpg)
The station is named after Changchun Bridge (simplified Chinese: 长春桥; traditional Chinese: 長春橋; pinyin: Chángchūn Qiáo).
Exits
There are 6 exits, lettered A1, A2, B, C, D1, and D2. Exits A1, A2, C and D2 have accessible elevators.
Gallery
-
Platform (Line 10)
-
Concourse (Line 10, July 2013)
-
Concourse (Line 10, February 2021)
-
Platform (Line 10, November 2018)
-
Concourse (Line 12, December 2024)
-
Concourse (Line 12, December 2024)
-
Exit A1, Line 10
-
Exit A2, Line 10
-
Elevator at Exit A2, Line 10
-
Exit B, Line 12
-
Exit C, Line 12
-
Elevator at Exit C, Line 12
-
Exit D1, Line 10
-
Exit D2, Line 10
-
Elevator at Exit D2, Line 10
References
- ^ a b "JPG格式线路图下载 北京地铁官方网站". Archived from the original on 2025-02-14.
- ^ (Chinese) 地铁车站首次下穿立交桥. 新浪. Archived from the original on 29 January 2022. Retrieved 28 January 2022.
- ^ (Chinese) 轨道交通四条新线12月30日开通试运营. Beijing Municipal Transportation Administration Bureau. Archived from the original on 11 May 2013. Retrieved 29 December 2012.
External links
Media related to Changchunqiao Station at Wikimedia Commons