Dhaka–Chittagong high-speed railway

Dhaka–Chittagong high-speed railway
Overview
Owner(undeclared)
Line number1
Service
Operator(s)(undeclared)
Technical
Line length227.3 km (141.2 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV AC, 50 Hz, overhead catenary
Operating speed300 km/h (190 mph)
Route map

Dhaka
Narayanganj
Cumilla
Feni
Chittagong

The Dhaka–Chittagong high-speed railway is a proposed high-speed rail line connecting Dhaka, the capital and largest city, with the southeast harbour city of Chittagong. The project is estimated to cost ৳96,752 crore (US$11.4 billion).[1]

The travel time between Dhaka and Chittagong will be 73 minutes for trains stopping at intermediate stations, and 55 minutes for nonstop trains. The ticket cost for one-way journey will be ৳2,000 without any discount or concession, more than three times higher than a conventional seat on current inter-city trains. [1]

History

On May 31, 2018, Bangladesh Railway signed an agreement with the China Railway Design Corporation and Mazumder Enterprise.[2] This contract is designed to verify the design and feasibility of proposed high-speed train lines. According to this agreement, feasibility and design work will be completed in December 2019 at a cost of Tk102.10 crore.[1][3] The government of Bangladesh is bearing this cost.[1][4]

It is expected to reduce travel time to between 55 and 73 minutes between Dhaka and Chittagong while current inter-city trains has to spent around six hours of travel time are needed to cover the distance by the current 321 km (199 mi) metre-gauge railways.[1] The new route will be 227.3 km (141.2 mi), making the route 90 kilometres (55 mi) shorter.[5]

668.24 hectares (1,651.3 acres) of land will be needed to be acquired.