Line 2 (Nanning Metro)
Metro line in Nanning, China
Line 2 of the Nanning Metro a rapid transit line running from north to south Nanning . It opened on the 28 December 2017.[1] The eastern extension opened on 23 November 2020.[2]
Opening timeline
Segment
Commencement
Length
Station(s)
Name
Xijin — Yudong
28 December 2017
21.2 km (13.17 mi)
18
Phase 1
Yudong — Tanze
23 November 2020
6.3 km (3.91 mi)[3]
5
Eastern extension
stations
Station name
Transfer
Distancekm
Location
English
Chinese
Zhuang
Xijin
西津
Sihcinh
0.00
0.00
Xixiangtang
Anji Coach Station
安吉客运站
Camh Yinhhek Anhgiz
3
Sulu
苏卢
Suhluz
Nanning No. 33 Middle School
三十三中
Samcibsam Cungh
Xiuxiang
秀厢
Siusiengh
Mingxiu Lu
明秀路
Roen Mingzsiu
5
Nanning Railway Station
火车站
Hojcehcan
1 NNZ
Xingning
Chaoyang Square
朝阳广场
Cauzyangz Gvangjcangz
1
Nanning Theater
南宁剧场
Nanzningz Gicangz
Jiangnan
Fujianyuan
福建园
Fuzgenyenz
Tinghong Lu
亭洪路
Roen Dingzhungz
Shizhuling
石柱岭
Sicuilingj
Jiangnan Coach Station
江南客运站
Camh Yinhhek Gyanghnanz
Dashatian
大沙田
Dasahdenz
4
Liangqing
Jianshe Lu
建设路
Roen Gensez
Shizitang
石子塘
Sizswjdangz
Jinxiang
金象
Ginhsieng
Yudong
玉洞
Yidung
Dongfeng Lu
东风路
Roen Dunghfungh
Yuling Lu
玉岭路
Roen Yilingj
Nafu Lu
那福路
Roen Nazfuz
Pingliang Overpass
平良立交
Bingzliengz Lizgyauh
3
Tanze
坛泽
Danzcwz
References
The article is a derivative under the Creative Commons Attribution-ShareAlike License .
A link to the original article can be found here and attribution parties here
By using this site, you agree to the Terms of Use . Gpedia ® is a registered trademark of the Cyberajah Pty Ltd