Line S9, Nanjing Metro
Line S9 | |
---|---|
S9 | |
Overview | |
Other name(s) | Gaochun line[1] Nanjing–Gaochun intercity railway Phase 2[2] Ninggao intercity railway Phase 2[3][a] |
Status | In operation |
Locale | Jiangning, Lishui, and Gaochun districts Nanjing, Jiangsu |
Termini | |
Stations | 6 |
Service | |
Type | Rapid Transit |
Operator(s) | Nanjing Metro |
History | |
Opened | 30 December 2017 |
Technical | |
Line length | 52.4 km (32.6 mi) |
Number of tracks | 2 |
Character | Elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line S9 is a north–south suburban metro line in the Nanjing Metro (Chinese: 南京地铁S9号线; pinyin: Nánjīng Dìtiě S-Jiǔ Hào Xiàn) system, which opened on December 30, 2017.[4] It connects to Line S1 at Xiangyulunan and crosses Shijiu Lake on a 12 km (7.5 mi) long bridge between Mingjue and Tuanjiewei.[5]
Line S9 also serves as the second stage of the Nanjing–Gaochun Intercity Railway, with Line S1 serving as the first stage. In June 2019 a few express trains started operating during rush hour, running non-stop between Xiangyulunan and Gaochun.[6]
Opening timetable
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Xiangyulunan — Gaochun | 30 December 2017 | 52.4 km (32.56 mi) | 6 | Ninggao ICR Phase 2 |
Station list
Services | Station Name | Connections | Distance km |
Location | |||
---|---|---|---|---|---|---|---|
L | Ex | English | Chinese | ||||
● | ● | Xiangyulunan | 翔宇路南 | S1 | 0.000 | 0.000 | Jiangning |
● | | | Tongshan | 铜山 | 10.003 | 10.003 | ||
● | | | Shiqiu | 石湫 | 7.374 | 17.377 | Lishui | |
● | | | Mingjue | 明觉 | 11.219 | 28.596 | ||
● | | | Tuanjiewei | 团结圩 | 16.912 | 45.508 | ||
● | ● | Gaochun | 高淳 | 6.232 | 51.740 | ||
Rolling Stock
Line S9 uses car Class B aluminum alloy trains with a maximum service speed of 120 km/h (75 mph).[7] The train cars are 2.8 meters (9 ft 2 in) wide with a transverse 2+2 seating layout, with 151 seats and a capacity of 441 people.[8] Unlike most Class B metro trains, each car only has 3 doors per side instead of 4, owing to the line's length and speed.
References
- ^ simplified Chinese: 高淳线; traditional Chinese: 高淳線; pinyin: Gāochún Xiàn
- ^ 南京到高淳城际轨道交通二期; 南京到高淳城際軌道交通二期; Nánjīng dào Gāochún Chéngjì Guǐdào Jiāotōng Èrqī
- ^ 宁高城际轨道交通二期; 寧高城際軌道交通二期; Níng-Gāo Chéngjì Guǐdào Jiāotōng Èrqī
- ^ "南京地铁S9宁高线12月底试运行!小苏带你先睹为快_我苏网". www.ourjiangsu.com. Retrieved 2020-05-10.
- ^ "南京版"千与千寻"海景地铁来啦!_我苏网". www.ourjiangsu.com. Retrieved 2020-05-10.
- ^ 中国江苏网 (2019-06-05). "6月6日起,地铁宁高线开行直达快车". news.sina.com.cn. Retrieved 2020-05-10.
- ^ "宁高二期今日模拟试运行_中国江苏网". 2020-03-26. Archived from the original on 26 March 2020. Retrieved 2022-01-04.
- ^ "南京地铁S9号线昨试跑 开往乡野的地铁刷新城市格局_中国江苏网". 2021-02-21. Archived from the original on 21 February 2021. Retrieved 2022-01-04.
External links
- Line S9 on the official Nanjing Metro website (includes route map) (in Chinese)