Aljunied MRT station

 EW9 
Aljunied
阿裕尼
அல்ஜூனிட்
Aljunied
Rapid transit
Aerial view of Aljunied MRT station
General information
Location81 Lorong 25 Geylang
Singapore 388310
Coordinates1°18′59.19″N 103°52′58.73″E / 1.3164417°N 103.8829806°E / 1.3164417; 103.8829806
Operated bySMRT Trains (SMRT Corporation)
Line(s)
Platforms2 (1 island platform)
Tracks2
ConnectionsBus, Taxi
Construction
Structure typeElevated
Platform levels1
Bicycle facilitiesYes
Disabled accessYes
Other information
Station code EW9 
History
Opened4 November 1989; 34 years ago (1989-11-04)
ElectrifiedYes
Services
Preceding station   Mass Rapid Transit   Following station
towards Pasir Ris
East West line
towards Tuas Link

Aljunied MRT station (EW9) is an above-ground Mass Rapid Transit (MRT) station on the East West line in Geylang, Singapore. Named after Aljunied Road, this station primarily serves Aljunied, one of the subzones that make up Geylang planning area. The station was opened on 4 November 1989. It was formerly called E4, well before 2001.

History

On 26 June 2009, train services along the East West line were disrupted for almost 18 minutes at about 7.25 pm after a Chinese man in his 40s jumped onto the train tracks ran towards Paya Lebar. SMRT staff did not manage to find the man but he was arrested by the police after found his way down to the street. He had leg injuries and was later charged with attempted suicide.[1]

Aljunied was the temporary terminal for trains that travel to and from Joo Koon during the early closures, late openings and full closures from 5 January 2018 to 4 February that year.[2][3][4]

Related pages

References

Other websites

Media related to Aljunied MRT station at Wikimedia Commons