Yinchuan–Lanzhou high-speed railway

Yinchuan–Lanzhou high-speed railway
Overview
Native name银兰客运专线
StatusOperational
OwnerChina Railway
LocaleNingxia and Gansu
Termini
Stations7
Service
TypeHigh-speed rail
Operator(s)China Railway Lanzhou Group
Technical
Line length430 km (270 mi)
Number of tracks2 (Double-track)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Minimum radius800 m (2,600 ft) (Yinchuan–Hedong Airport)

7,000 m (23,000 ft) (Hedong Airport–Wuzhong)

3,500 m (11,500 ft) (Wuzhong–Shuping Section)
Electrification25 kV 50 Hz AC (Overhead line)
Operating speedYinchuan–Yinchuan East: 160 km/h (99 mph)

Yinchuan East– Hedong Airport: 220 km/h (140 mph)

Hedong Airport to Shuping: 250 km/h (160 mph)
SignallingABS
Maximum incline2.5% (Yinchuan–Wuzhong, Zhongwei South–Shuping)
2% (Wuzhong to Zhongwei South section)
Route map

km
Yinchuan EMU operations depot
0
Yinchuan
5
Yuejiaqiao line station
Liangtianzhen line station
Yinchuan South
16
Yinchuan East
(opening suspended)
Baotou–Yinchuan HSR to BayanhaoteLeft arrow
33
Hedong Airport
Hedong Airport Tunnel (4,200m)
55
Lingwu North
Ningdong Railway to Guyaozi Right arrow
Daba
74
Wuzhong
Guanmahu (reserved)
123
Hongsibao North
160
Zhongning East
Huangyangwan
Qingshui river
Liujiazhuang
Xuanhe South (reserved)
207
Zhongwei South
Zhongwei South EMU depot
Xiangshan Tunnel (17,763.3m)
Guojia Tunnel (255m)
Shimen Tunnel (465m)
Shimen Tunnel (1,584m)
Huashanling Tunnel (682m)
Tiaoshigou Tunnel (227m)
Dashanqi Tunnel (1,927m)
Xiamen Tunnel (992m)
264
Beitan
Jianshan tunnel (6,002m)
302
Pingchuan West
321
Jingyuan North
Honghui railway to Honghui Right arrow
Baiyin West
Biyunshan Tunnel (422.275m)
Beiwan (reserved)
Jianjinshan Tunnel (1,020m)
Baotaishan Tunnel (5,269m
Xujiacha Tunnel (787m)
Yangwan Tunnel (262m)
Shachuanzi East Tunnel (984.33m)
Baiyin South EMU Depot
371
Baiyin South
Yingpanshan Tunnel (1,242.765m)
Weijiataizi Tunnel (1,083.645m)
Shijiacha Tunnel (201.4m)
Hongfeng Tunnel (419.32m)
Chelugou Tunnel (146.78m)
Zhuanshiliang Tunnel (4,578m)
408
Qinwangchuan
Zhongchuan Airport loop
line to Shilakousuo
Right arrow
Pingxiancun Tunnel (389.75m)
Banhyeonsan Tunnel (2,788.36m)
421
Dingjiagou line station
429
Shuping
(end of Yinchuan–Lanzhou HSR)
448
Huangyangtou line station
Baijiapu No. 3 Tunnel (543m)
Baijiapu No. 2 Tunnel (491.5m)
Baijiapu Tunnel No. 1 (163m)
Nampoping Tunnel (3,187m)
460
Xigu
463
Fuliqu
4-track section
465
Chenguanying
Baishi No. 2 Tunnel (267m)
Baishi No. 1 Tunnel (350m)
Lanzhou West operations depot
474
Lanzhou West
Lanzhou West EMU depot
484
Lanzhou
km

Yinchuan–Lanzhou high-speed railway is a high-speed railway in China between Lanzhou, the capital of Gansu province, and Zhongwei in Ningxia.[1] It forms part of the Beijing–Lanzhou corridor, part of China's "Eight Vertical and Eight Horizontal" network.

Construction started in 2017 and completed on 29 December 2022.[2] The section between Zhongchuan Airport and Lanzhou West is the already completed Lanzhou-Zhongchuan Airport Intercity Railway. This section will also be shared with the Lanzhou–Zhangye intercity railway.

History

The line was built in two sections. A 207 kilometres (129 mi) section from Yinchuan to Zhongwei, opened on 29 December 2019.[3] The remaining section from Zhongwei to Lanzhou opened on 29 December 2022.[2]

References

  1. ^ 中卫至兰州高速铁路开工建设. 19 June 2017.
  2. ^ a b "银兰高铁中兰段开通运营". Archived from the original on 29 December 2022.
  3. ^ "宁夏结束没有高速铁路历史". www.chinanews.com. Retrieved 7 November 2020.